Fine Blanking Press Price Guide
Press price depends on tonnage, guiding precision, control platform and add-on equipment — not tonnage alone. Here's what actually moves the number, and realistic price bands to plan a budget against.
What Drives Fine Blanking Press Cost
Tonnage & Frame Size
Larger frames, more steel and larger hydraulic components scale cost with tonnage.
Guiding Precision Grade
Tighter guiding tolerance requires more precision grinding and fitting time.
Control Platform
Standard PLC/HMI vs. advanced recipe/OEE data logging changes electrical cost.
Drive Type
Servo-hydraulic drive carries a premium over standard hydraulic drive.
Indicative Price Bands by Tonnage
| Press | Tonnage | Base Press — Indicative Range |
|---|---|---|
| HF200 | 200T | Entry tier of our range |
| HF320 / HF400 | 320T / 400T | Lower-mid tier |
| HF500 / HF650 | 500T / 650T | Mid tier |
| HF700 / HF800 | 700T / 800T | Mid-high tier |
| HF1000 / HF1200 | 1000T / 1200T | Top tier of standard range |
We intentionally don't publish fixed numbers here — coil feeding, deburring, servo drive and control-platform options change the total meaningfully, and currency/freight terms vary by destination. Send your part and target volume for a firm, itemized quotation.
Base Press vs. Full Production Cell
A "press price" alone is rarely the number that matters for your project. Most buyers should budget for:
- Base press (the tonnage platform itself)
- Coil feeding system, if not already on hand
- Fine blanking die design and build for your specific part
- Deburring/edge-finishing equipment, if your part spec requires it
- Freight, import duty and installation
Get an Itemized Quote
- Turnaround
- 24 Hours
- Needed From You
- Part Drawing + Volume
- Contact
- Helen
What to Send for an Engineering Price
Part and Material
Drawing, material grade, thickness, critical dimensions and edge requirements.
Production Plan
Annual volume, shift pattern, lot size, target output and planned changeovers.
Supply Boundary
Press, die, feeding, deburring, automation, destination and installation support required.
For a supplier due-diligence framework, use the China manufacturer evaluation guide.
Ready to discuss your fine blanking project?
Send us your part drawing and volume requirements — our engineers will respond with a tonnage recommendation and quotation within 24 hours.