BUYING GUIDE · COST

Fine Blanking Press Price Guide

Press price depends on tonnage, guiding precision, control platform and add-on equipment — not tonnage alone. Here's what actually moves the number, and realistic price bands to plan a budget against.

What Drives Fine Blanking Press Cost

Tonnage & Frame Size

Larger frames, more steel and larger hydraulic components scale cost with tonnage.

Guiding Precision Grade

Tighter guiding tolerance requires more precision grinding and fitting time.

Control Platform

Standard PLC/HMI vs. advanced recipe/OEE data logging changes electrical cost.

Drive Type

Servo-hydraulic drive carries a premium over standard hydraulic drive.

Indicative Price Bands by Tonnage

PressTonnageBase Press — Indicative Range
HF200200TEntry tier of our range
HF320 / HF400320T / 400TLower-mid tier
HF500 / HF650500T / 650TMid tier
HF700 / HF800700T / 800TMid-high tier
HF1000 / HF12001000T / 1200TTop tier of standard range

We intentionally don't publish fixed numbers here — coil feeding, deburring, servo drive and control-platform options change the total meaningfully, and currency/freight terms vary by destination. Send your part and target volume for a firm, itemized quotation.

Base Press vs. Full Production Cell

A "press price" alone is rarely the number that matters for your project. Most buyers should budget for:

  • Base press (the tonnage platform itself)
  • Coil feeding system, if not already on hand
  • Fine blanking die design and build for your specific part
  • Deburring/edge-finishing equipment, if your part spec requires it
  • Freight, import duty and installation

Get an Itemized Quote

Turnaround
24 Hours
Needed From You
Part Drawing + Volume
Contact
Helen
Request a Quote
COMPARABLE QUOTATION INPUTS

What to Send for an Engineering Price

Part and Material

Drawing, material grade, thickness, critical dimensions and edge requirements.

Production Plan

Annual volume, shift pattern, lot size, target output and planned changeovers.

Supply Boundary

Press, die, feeding, deburring, automation, destination and installation support required.

For a supplier due-diligence framework, use the China manufacturer evaluation guide.

Ready to discuss your fine blanking project?

Send us your part drawing and volume requirements — our engineers will respond with a tonnage recommendation and quotation within 24 hours.